New Home Construction

D&D Heating & Cooling is one of the few companies that are certified by ACCA (Air Conditioner Contractors of America) to install EnergyStar Version 3 newly constructed homes.

Building a house is one of the most exciting and stressful experiences most of us have in a lifetime. By familiarizing yourself with the five major phases to the process, and relying on D & D to build your home to your exact specifications, this process can be an enjoyable and and stress-free!

The following is a break-down of the process of building your new home:

Stage 1 – Foundation

Before the foundation is poured, there is a lot of work to do. The site must be graded and excavated and the foundation laid out according to the plot map. Rough plumbing is installed and inspected and, finally, the foundation for the house, garage and porch is poured.

Stage 2 – Framing

This is when your house starts looking like a house. During this phase, all of the home’s interior and exterior walls and the stairs are framed. Now it’s time to get keep the weather out, by installing the sheathing, roof, shingles, exterior doors and windows. The quicker this phase is completed, the fewer weather-related delays you’ll experience while finishing the interior of the house.

Stage 3 – Plumbing, Mechanical, Electrical

The work that happens during this phase has to be done right, because once sheetrock is put over it, everything will be harder and more expensive to get to. Water, waste piping, water heater, HVAC system, ductwork and rough electrical wiring — the guts of your new home — are installed during this stage. All of these systems require inspection to assure you can safely move on to the next phase.

Stage 4 – Insulation and Drywall

First the walls are insulated and then the drywall or sheetrock is installed over them. By now, you and your builder should have discussed details about sheetrock thickness, how it will be fastened to the studs (nails or screws) and what type of texture or paint you have the budget to finish with.

Stage 5 – Exterior and Interior Finish

In this phase, all the final details are taken care of, including installation and testing of electrical, mechanical, HVAC and plumbing systems and the installation of ceilings, doors, baseboards, window sills, floor coverings, countertops, cabinets, tiles, appliances, mirrors, lights, faucets and showerheads. Everything gets a covering of paint or wallpaper and the driveway and sidewalks are poured. Final inspections, both municipal and with your inspector, are performed now and landscaping is done.